Complete Dewatering Systems

Complete Sludge Dewatering Systems — One Line, One Supplier

A turnkey sludge dewatering system is more than a dewatering machine: screening protects it, thickening feeds it, polymer conditions the sludge, conveying takes the cake away. Loway engineers, builds and commissions every stage of that line — so when throughput or sludge changes, one team owns the answer.

The six stages

What a Complete Dewatering Line Includes

Stage by stage, from the channel to the cake hopper. Every stage below is a Loway product line — or a package we integrate from partners we have used for years.

1Head of line

Screening & Grinding

Rags, plastics and coarse solids are screened or macerated before they can rag a pump or score a screw. This stage decides whether the rest of the line runs quietly or in maintenance mode.

Internally-fed drum screen installation layout in a treatment channel

2Feed

Pumping & Flow Control

Progressive-cavity feed pumps, flow metering and buffer capacity that keep the dewatering stage fed at a steady rate — because a starving or surging feed wastes polymer and dries the cake unevenly.

3Volume

Pre-Thickening

Drum or gravity thickening lifts feed solids before dewatering — halving the machine size you need in most municipal and organic-industrial duties. The cheapest dryness you will ever buy is the dryness you get for free.

4Chemistry

Polymer Dosing

PAM make-up and dosing units metered to the measured dose from your bench test — with the inline mixing that turns a polymer budget from a guess into a number.

Loway PAM polymer dosing system for sludge conditioning

5Core

Dewatering — the Core

Filter press, belt press or screw press: the technology is chosen on your feed and dryness target, not on what we happen to overstock. The comparison table below shows how the three cores trade off.

Loway screw press sludge dewatering machine

6Tail of line

Conveying & Loading

Screw conveyors and discharge handling move cake to the skip, bagging station or truck — the stage everyone forgets until the cake lands on the floor.

Screw conveyor for dewatered cake handling

Electrical & control run across all six stages — one PLC, one HMI, one control philosophy. Operators learn one interface; your maintenance team calls one number. See how each machine is tested before it joins the line.

Choosing the core

Filter Press, Belt Press or Screw Press?

Three dewatering cores, three honest positions. Typical values below — your bench test decides which row applies to your sludge.

Loway chamber filter press — high-efficiency dewatering machine

Filter Press

1.5–40% DS · driest cake (30–60% DS) for high-value or hard-to-dispose-casile streams.

View filter press

Loway high-pressure belt filter press — continuous dewatering

Belt Filter Press

2–5% DS · continuous duty, ideal for steady municipal flows and 24-hour shifts.

View belt filter press

Loway multi-disc screw press — customized dewatering screw

Multi-Disc Screw Press

2–6% DS · fully automatic, most compact, self-cleaning rings for unattended plants.

View screw press

Filter Press Belt Filter Press Multi-Disc Screw Press
Typical feed solids 1.5–40% DS (very tolerant) 2–5% DS, thickened feed preferred 2–6% DS after screening
Achievable cake 30–60% DS, driest cake 18–28% DS, continuous 18–25% DS, continuous
Duty pattern Batch cycles (30–120 min) Continuous, 24 h shifts Continuous, fully automatic
Footprint & civil Largest; needs plate-shift headroom Medium; gravity drainage zone Most compact; skid-mounted
Operator attention Medium — cycle supervision, cloth wash Medium — belt tracking, wash water Lowest — self-cleaning rings
Best fit Dry cake has value or disposal is costly Steady municipal flows, long shifts Small plants, unattended operation

Cannot decide? The technology selection guide walks the decision in detail, and a bench test on your sample ends the debate with numbers.

Scope of supply

What Loway Delivers — and What We Ask of You

Sewage treatment plant process with Loway filter press equipment
A Loway line installed at a sewage treatment plant — screening, conditioning and filter-press dewatering under one control system.
  • Process design & P&ID — line layout, hydraulics and motor list, issued for your review before anything is built.
  • Equipment manufacture — every machine built, pressure-tested and dry-run in our Zhenjiang plant before container loading.
  • PLC & instrumentation — one control system covering all stages, programmed to your operating philosophy.
  • Commissioning & training — engineers on site for start-up, performance run and operator handover.
  • Spares & documentation — CE file, manuals in your language, and a spares list agreed before shipment.
  • From you — civil works, power, water and sludge data (or a sample we test together). We tell you exactly what each stage needs.

Why one supplier

One Line, One Contract, One Number to Call

Multi-vendor lines fail at the interfaces — the pump nobody sized for the press, the conveyor that arrived 40 mm too high. A single-manufacturer line puts every interface inside one engineering office.

One P&IDevery stage sized against the same hydraulic case.
One PLCone interface, one alarm philosophy, one trend log.
One contact24×7 inquiry line, spares in 72 h from confirmation.

Complete system FAQ

Turnkey Line Questions, Answered

Do I have to buy the whole line from Loway?
No. Many plants start with the dewatering core alone and add stages later — the layout we issue leaves room for the stages you build yourself or already own. We will also quote a line around third-party equipment you cannot replace, and say clearly where responsibility boundaries fall.
What information do you need to quote a complete system?
Flow rate, feed solids, the dryness target and what happens to the cake afterwards. With a sludge sample we can size the line on measured behaviour instead of assumptions — that is what the bench test is for. A first budget range usually takes one message.
How is a multi-machine line shipped and installed?
Machines are dry-run and tested in our plant, then container-loaded with a packing list and lifting plan. Commissioning is by Loway engineers on site — typical installation and start-up windows are agreed in the proposal, and operator training is part of the handover, not an extra.
Can you match our existing PLC and control room?
Usually yes — we adapt to your platform and protocols, or supply a standalone panel that hands over hardwired signals. Control philosophy is fixed in the design review before manufacture, so nothing surprises your electricians at start-up.
What about spares for a six-stage line?
One spares list covering every stage, agreed before shipment and priced with the proposal — so your first stock-up is a purchase order, not a study. Wear parts for the core machines ship in 72 hours from order confirmation; see Parts & Service.

Next step

Send the Numbers — Get a Line Layout

Flow, solids and cake target are enough for a first layout, equipment list and budget range. An engineer replies within 24 hours — or start with a bench test and size the line on your sludge, not on assumptions.